We also seal the seams for various purposes:
Insulating – separating the concrete slab of the monolithic floor from the building structures (walls, columns, foundations).
Structural (technological) – allowing deformation of individual floor segments concreted at different times.
Temperature, deformation – installed in the temperature zone of the building.
Preventive shrinkage – cut in the floor slab after 1 to 2 days of concrete hardening, which breaks down the concrete
the floor into separate areas, reducing cracking due to shrinkage deformations.